1.6 KiB
1.6 KiB
Nutrient Timing Clarification
The nutrient schedule is based on elapsed time after pitch, not calendar date labels.
Recorded pitch time:
2026-07-16 22:51 EDT
Actual early nutrient timing
| Target | Actual/Planned time | Elapsed from pitch | Status |
|---|---|---|---|
| T+24h nutrient | 2026-07-17 21:40 EDT | 22.8h | Done |
| T+48h nutrient | 2026-07-18 21:06 EDT | 46.3h | Done |
| T+72h nutrient | 2026-07-19 21:08 EDT | 70.3h | Done |
| Rest/watch night | 2026-07-20 evening | ~94h | No Fermaid O by default |
| Day 5 / 1⁄3 sugar-break check | 2026-07-21 21:00 EDT | ~118h | Upcoming |
Why the file labels are confusing
The repo originally used:
day-1-brew-day.md = brew day / pitch
day-2.md = about T+24h
day-3.md = about T+48h
day-4.md = about T+72h
But the fermentation log uses Day 0 for pitch, then Day 1, Day 2, Day 3 for elapsed days after pitch. Both conventions are common, but mixing them is confusing.
Correct interpretation
day-4.mdmeans the third nutrient addition at about T+72h.- That was already completed on
2026-07-19 21:08 EDT, about 70 hours after pitch. 2026-07-20 21:00 EDTis about 94 hours after pitch, so it is a rest/watch night.- The next possible nutrient action is the Day 5 / 1⁄3 sugar-break check around
2026-07-21 21:00 EDT.
Practical rule
For the current batch, trust this sequence:
T+24h: 3 g Fermaid O — done
T+48h: 3 g Fermaid O — done
T+72h: 3 g Fermaid O — done
T+~120h / Day 5: check gravity/activity; maybe final 3 g Fermaid O
Do not add Fermaid O on the rest/watch night unless troubleshooting indicates a reason.