Admit and schedule cellular intentions
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 1m58s
Foundation / checks (client) (push) Failing after 4m25s
Foundation / checks (network) (push) Failing after 3m5s
Foundation / checks (tsan) (push) Failing after 32s
Foundation / checks (postgres) (push) Failing after 2m29s
Foundation / checks (checks) (push) Failing after 9m23s
Foundation / postgres-tools (push) Skipped
Foundation / server-image (push) Skipped
Foundation / image (push) Skipped
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 1m58s
Foundation / checks (client) (push) Failing after 4m25s
Foundation / checks (network) (push) Failing after 3m5s
Foundation / checks (tsan) (push) Failing after 32s
Foundation / checks (postgres) (push) Failing after 2m29s
Foundation / checks (checks) (push) Failing after 9m23s
Foundation / postgres-tools (push) Skipped
Foundation / server-image (push) Skipped
Foundation / image (push) Skipped
This commit is contained in:
@@ -5949,3 +5949,21 @@ The CMake/Ninja build of `evo-network-tests` remained idle for about 90 seconds
|
||||
(cmake 0.02 CPU seconds, ninja 0.09, no `cl`/`link` child), so I interrupted it;
|
||||
the full M10 network suite and server admission/QUIC integration remain pending.
|
||||
Linux network CI has not yet qualified this version.
|
||||
|
||||
## 2026-10-10 — M11.3b-4 cellular intention admission (CI pending)
|
||||
|
||||
Cellular v6 intentions now pass through the established authenticated-session,
|
||||
epoch, movement-bound, increasing-sequence, future-tick, rate and unresolved
|
||||
input checks. The pending schedule is read-only until the simulated watermark
|
||||
advances and orders by tick, account, session ID and sequence, including the
|
||||
case where one account has multiple open sessions. The cellular region owner
|
||||
and durable publication path still do not consume this schedule.
|
||||
|
||||
Executed locally: warning-as-error MSVC 19.44 Debug and Release/NDEBUG direct
|
||||
compile/run of the focused admission regression; existing CTest
|
||||
`cellular-intention-protocol-v6` (1/1 passed); clang-format 19.1.5 on the new
|
||||
test, changed header and implementation ranges; clang-tidy 19.1.5 on the changed
|
||||
test and implementation using `-std=c++23`; and `git diff --check`. The network
|
||||
CMake configure stalled during MSVC compiler detection, so the new CTest
|
||||
registration and complete network build await CI. Linux and full M10 network
|
||||
checks remain pending.
|
||||
|
||||
Reference in New Issue
Block a user