Define M7.1 region durability and state closure contract
This commit is contained in:
@@ -23,6 +23,7 @@ network service. Dev verification manifests are separate from the simulation.
|
||||
- [Versioned abiotic base generation](docs/world/BASE_GENERATION.md)
|
||||
- [Actual validation results](docs/engineering/VALIDATION.md)
|
||||
- [Current delivery status and next steps](docs/STATUS.md)
|
||||
- [Region durability and state-closure contract](docs/architecture/REGION_DURABILITY.md)
|
||||
- [Bounded environmental intervals and resume](docs/architecture/ENVIRONMENTAL_SCHEDULING.md)
|
||||
- [Opt-in ECS evaluation and measurements](docs/engineering/ECS_EVALUATION.md)
|
||||
- [Sequential command scheduling and recovery](docs/architecture/SCHEDULER_CONTRACT.md)
|
||||
|
||||
Reference in New Issue
Block a user