Define M7.1 region durability and state closure contract
This commit is contained in:
@@ -486,3 +486,12 @@ Direct execution matches scheduled restore/retry continuation. Extended run:
|
||||
5120 episodes, 655360 logical ticks, exact inventories and stable residency.
|
||||
See engineering/ENVIRONMENTAL_SLICE_QUALIFICATION.md for costs and scope limits.
|
||||
Next: M7.1 region durability contract; M6 does not claim durable worker recovery.
|
||||
|
||||
M7.1 design complete (2026-09-27): ADR-0058 chooses full checkpoint batches and
|
||||
publishes REGION_DURABILITY.md plus schemas/region-commit.md. State closure,
|
||||
watermarks, bounds, immutable candidate publication, exact retry reconciliation,
|
||||
permanent ACKs and the crash-point matrix are explicit. This is a contract gate,
|
||||
not a running database/server. M6 environmental state is complete only within its
|
||||
profile; M7.4 must add archive serialization and organism/genome binding before
|
||||
M7.9 can claim retained ancestry. The M7 exit criteria remain unchanged.
|
||||
Next: M7.2 evaluate/pin storage dependencies and implement/test migrations.
|
||||
|
||||
Reference in New Issue
Block a user