Add M10.8b signed handoff tickets and ticket admission
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 1m55s
Foundation / checks (client) (push) Successful in 12m40s
Foundation / checks (postgres) (push) Canceled after 4s
Foundation / checks (network) (push) Successful in 12m53s
Foundation / checks (tsan) (push) Successful in 7m55s
Foundation / checks (checks) (push) Successful in 31m47s
Foundation / postgres-tools (push) Skipped
Foundation / server-image (push) Skipped
Foundation / image (push) Skipped

ADR-0096. A source region's handoff key signs a 160-byte ticket for one probe
transfer, account and destination; it rides the Hello grant slot and is
verified against neighbour keys bound to their regions. SessionControl
admits a ticket once per region, superseding like a grant, with the session
ending at the client's original grant expiry. RegionSessions makes the
destination's durable step first: PostgresHandoffLedger stages and commits
the transfer and moves the account's control, idempotently.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
dingo
2026-10-06 18:32:14 -04:00
co-authored by Claude Opus 5.5
parent 6a645ef7e4
commit 0ce51077b1
18 changed files with 1039 additions and 19 deletions
+3 -2
View File
@@ -535,8 +535,9 @@ traces done (networking/M10_PREDICTION_TRACES.md). 10.7 split (ADR-0095): 10.7a
remote-marker interpolation and fractional prediction done; 10.7b client wiring, stale loss
view and two-client interpolation traces done. 10.8 split (ADR-0096, the persistence
handoff ADR; EXPERIMENT durable probe records): 10.8a schema v12 probe records and the
transfer state machine with a PostgreSQL fault matrix done; 10.8b handoff tickets, 10.8c
region wiring and 10.8d two-process kill tests follow. 10.9 planned.
transfer state machine with a PostgreSQL fault matrix done; 10.8b signed handoff tickets and
ticket admission (durable stage, commit and control move) done; 10.8c region wiring and 10.8d
two-process kill tests follow. 10.9 planned.
**Entry:** M9 client/session evidence and M7/M8 dev/stage durability. Read
NETWORK_ARCHITECTURE, PERSISTENCE_ARCHITECTURE and ADR-0017. The M9 transport is