Measure M10.2c loss and head-of-line behaviour of the QUIC channels
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 1m46s
Foundation / checks (network) (push) Successful in 8m16s
Foundation / checks (client) (push) Successful in 12m6s
Foundation / checks (tsan) (push) Successful in 7m46s
Foundation / checks (checks) (push) Successful in 31m39s
Foundation / checks (postgres) (push) Successful in 33m28s
Foundation / postgres-tools (push) Successful in 19s
Foundation / image (push) Successful in 2m15s
Foundation / server-image (push) Successful in 18m31s

evo-quic-hol-measure sends the same 20 Hz state on the DATAGRAM channel and the
ordered reliable stream plus 16 KiB reliable messages through the impairment relay
across RTT x loss. Under 5-10 % loss the stream's p95 is 3-5.5x the datagrams' and
exceeds the 250 ms target at 100 ms RTT, confirming the ADR-0090 channel split.
The relay and tool request 1 ms timer resolution on Windows.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
dingo
2026-10-03 17:25:38 -04:00
co-authored by Claude Opus 5.5
parent ca762bff75
commit 1055cc8c8f
10 changed files with 405 additions and 5 deletions
+4 -1
View File
@@ -13,7 +13,10 @@ converts or ratifies them. M10.2a selects QUIC with msquic 2.6.2 and OpenSSL 3.5
(ADR-0090), pinned and building on Windows and Linux with a loopback smoke test. M10.2b adds
the bounded QUIC endpoint (datagram and reliable channels, exact CA pinning with the owned
check authoritative, minimum-MTU start) and the owned impairment relay, tested on both
platforms. Next: M10.2c loss and head-of-line measurements.
platforms. M10.2c measures loss and head-of-line blocking through the relay: under 5-10 %
loss the ordered stream's p95 latency is 3-5.5x the datagram channel's and exceeds the
250 ms target at 100 ms RTT, while datagrams stay <= 67 ms, which confirms the channel split
(networking/M10_TRANSPORT_MEASUREMENTS.md). M10.2 is complete. Next: M10.3 session binding.
## Previous gate - 2026-10-02