Serialize build retirement and clone classification, bound ops accepts
Review fixes for M7.6-M7.9. Schema v9 applies one lock order: the barrier takes a database-wide upgrade lock exclusively, while acquisitions, lease checks, provisioning and the retired-build trigger take it shared first, so a queued acquisition can no longer regain authority for a just-retired build and concurrent barriers cannot retire the last current build. Provisioning takes a per-world lock before classifying a world as original or a clone of one source. The operations listener makes at most four accept attempts per serve(). Race regressions prove each contender is blocked before commit. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -99,3 +99,15 @@ zlib, CA certificates):
|
||||
- A later gateway must honor readiness and the lease epoch before routing.
|
||||
- Promoting to World0 needs a scanned, signed image and a reviewed alerting policy
|
||||
(M8).
|
||||
|
||||
## Amendment: bounded accept work (2026-09-29 review)
|
||||
`serve()` used to accept, and close excess connections, until the backlog was
|
||||
empty. A replenished stream of connections could therefore hold the host loop
|
||||
without bound. Each call now makes at most `max_accepts_per_serve` (4) accept
|
||||
attempts, refused ones included. Pending connections wait in the 16-entry listen
|
||||
backlog, and deadlines are judged after the accept work.
|
||||
|
||||
Tests check the per-call budget, including at the connection cap, and that an
|
||||
accepted probe is still answered under replenished pressure. A real server keeps
|
||||
its lease and readiness while a client opens and closes connections continuously
|
||||
through 60 ticks.
|
||||
|
||||
Reference in New Issue
Block a user