Serialize build retirement and clone classification, bound ops accepts
Review fixes for M7.6-M7.9. Schema v9 applies one lock order: the barrier takes a database-wide upgrade lock exclusively, while acquisitions, lease checks, provisioning and the retired-build trigger take it shared first, so a queued acquisition can no longer regain authority for a just-retired build and concurrent barriers cannot retire the last current build. Provisioning takes a per-world lock before classifying a world as original or a clone of one source. The operations listener makes at most four accept attempts per serve(). Race regressions prove each contender is blocked before commit. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
@@ -2534,3 +2534,49 @@ Only clean-to-v1 and exact-v1 restart are supported migration paths at this gate
|
||||
The migration test caught this one after the host-test correction.
|
||||
- Not executed: Docker, the Gitea CI, cluster runs, a separate database host, and
|
||||
host or storage loss (M8).
|
||||
|
||||
## M7.6–M7.9 review fixes (schema v9) - 2026-09-29
|
||||
|
||||
Review `.cache/reviews/M7_6-M7_9_REVIEW.md` found three issues. All three are
|
||||
fixed:
|
||||
- **[P1] Build retirement could race acquisition.** Schema v9 applies one
|
||||
upgrade-lock order across the barrier, acquisitions, lease checks, provisioning
|
||||
and the retired-build trigger.
|
||||
- **[P2] Clone-world classification could race.** Provisioning now takes a
|
||||
per-world lock and checks classification after it.
|
||||
- **[P2] The operations listener accepted without bound.** Each `serve()` now
|
||||
makes at most 4 accept attempts.
|
||||
|
||||
Evidence:
|
||||
- WSL Linux `checks` set (Debug, Release, analysis, ASan/UBSan): CTest 59/59
|
||||
each. The format check passed.
|
||||
- PostgreSQL ASan/UBSan: full suite passed. Analysis and Release were rerun green
|
||||
after fixing two clang-tidy findings in the new tests. Upgrade paths now end at
|
||||
1..9.
|
||||
- Race tests (database `evo_race`): each holds a transaction open, confirms the
|
||||
contender is blocked on a lock via `pg_stat_activity`, then commits.
|
||||
- A build-less acquisition queued behind a barrier is refused (EVL06).
|
||||
- A build-aware acquisition of the build being retired is refused, and the
|
||||
region stays unheld.
|
||||
- The next build acquires.
|
||||
- Racing barriers for the last two current builds: one returns 22023 and one
|
||||
build stays current.
|
||||
- Different-source clones into one world, and an original region racing a
|
||||
clone: the second is refused (22023).
|
||||
- Same-source clones into different regions both succeed.
|
||||
- The final origins are exactly `2/1<10, 4/1<10, 4/2<10`.
|
||||
- Accept budget:
|
||||
- With 16 queued connections, successive `serve()` calls give 4 open, then 8
|
||||
open with 0 refused, then 8 open with 4 refused.
|
||||
- Refusals never exceed 4 per call under replenished connections.
|
||||
- The first accepted probe got 200.
|
||||
- A real server acknowledged 60 ticks under continuous connect/close churn
|
||||
without losing readiness.
|
||||
- Mutations, each reverting one fix (restored and rebuilt). Each was caught:
|
||||
- an unlocked build-aware acquire;
|
||||
- an unlocked legacy acquire;
|
||||
- an unlocked barrier;
|
||||
- no per-world lock;
|
||||
- an accept budget of 1000.
|
||||
- Qualification was unchanged: SIGKILL to ready took 19.55–19.60 s.
|
||||
- Windows was not rerun. All changes are Linux PostgreSQL, server or doc files.
|
||||
|
||||