Add M10.8d two-process handoff fault matrix and recovery fixes
Foundation / checks (deploy) (push) Successful in 3m20s
Foundation / checks (ecs) (push) Successful in 1m57s
Foundation / checks (client) (push) Failing after 10m4s
Foundation / checks (network) (push) Successful in 13m3s
Foundation / checks (tsan) (push) Successful in 7m53s
Foundation / checks (checks) (push) Successful in 32m18s
Foundation / checks (postgres) (push) Successful in 43m26s
Foundation / postgres-tools (push) Skipped
Foundation / server-image (push) Skipped
Foundation / image (push) Skipped

ADR-0096. Two real evo-server processes on PostgreSQL (regions 7/161 and
7/162, adjacent areas) run crossings and crossings back, SIGKILL of the
source after prepare and of the destination after stage and after commit,
duplicate and stale ticket retries, a client that never arrives and a
destination that is down. After every scenario SQL checks one owner per
probe, the conserved inventory and frozen-iff-open-transfer.

The matrix found two recovery gaps, now fixed:
- a source restarted after a prepare left the probe frozen for good (its
  abort deadline was in memory): schema v14 overdue_probe_transfers and a
  session-layer sweep abort open outgoing transfers past the ticket
  lifetime plus 10 s by the database clock;
- a ticket replayed at a restarted destination after the probe moved on
  took control back: admission of a committed transfer now requires the
  record as that commit left it.

M10.8 is complete. Refreshes the dev session window.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
dingo
2026-10-06 23:17:49 -04:00
co-authored by Claude Opus 5.5
parent dabeee8e8b
commit 265163a9a6
26 changed files with 856 additions and 20 deletions
+3 -1
View File
@@ -539,7 +539,9 @@ transfer state machine with a PostgreSQL fault matrix done; 10.8b signed handoff
ticket admission (durable stage, commit and control move) done; 10.8c-1 session protocol v4,
durable probes in sessions, edge crossing, ghosts (schema v13) and a two-region loopback test
done; 10.8c-2 client switch (offers, redirects, multi-region grants) and evo-server/probe
configuration done; 10.8d two-process kill tests follow. 10.9 planned.
configuration done; 10.8d two evo-server processes on PostgreSQL with SIGKILL around each
durable step, duplicate/stale retries and a failed destination done (schema v14 recovery
sweep, replay guard). M10.8 complete. 10.9 planned.
**Entry:** M9 client/session evidence and M7/M8 dev/stage durability. Read
NETWORK_ARCHITECTURE, PERSISTENCE_ARCHITECTURE and ADR-0017. The M9 transport is