Wire M10.7b interpolation and the stale loss view into the client
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 1m55s
Foundation / checks (client) (push) Successful in 12m27s
Foundation / checks (network) (push) Successful in 12m46s
Foundation / checks (tsan) (push) Successful in 7m59s
Foundation / postgres-tools (push) Canceled after 0s
Foundation / server-image (push) Canceled after 0s
Foundation / image (push) Canceled after 0s
Foundation / checks (checks) (push) Canceled after 25m13s
Foundation / checks (postgres) (push) Canceled after 12m48s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 1m55s
Foundation / checks (client) (push) Successful in 12m27s
Foundation / checks (network) (push) Successful in 12m46s
Foundation / checks (tsan) (push) Successful in 7m59s
Foundation / postgres-tools (push) Canceled after 0s
Foundation / server-image (push) Canceled after 0s
Foundation / image (push) Canceled after 0s
Foundation / checks (checks) (push) Canceled after 25m13s
Foundation / checks (postgres) (push) Canceled after 12m48s
ADR-0095. The engineering client times presentation with the tick clock: its own marker between ticks, other markers interpolated a few ticks behind (grey when stale). Silence beyond 3 ticks and long-gap holds are stale. A lost session leaves its last view frozen and labelled stale until the reconnect's fresh baseline; nothing is predicted or sent meanwhile. evo-motion-trace --remote measures remote-marker error between two clients through the relay, with a 1.5 s outage (motion-trace-remote-smoke CTest). Prediction errors are recorded only for ticks inputs are scheduled for. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
+5
-2
@@ -61,8 +61,11 @@ camera and interest. M10.6c traces it through the impairment relay: exact withou
|
||||
94-99 % exact at 60-200 ms RTT with 2-5 % loss, convergence after stopping and a restart
|
||||
resync of about 2-3 s (networking/M10_PREDICTION_TRACES.md). M10.6 is complete. M10.7a (ADR-0095) adds a drift-corrected tick clock, adaptive
|
||||
interpolation of remote markers (2-6 ticks behind, at most 2 ticks extrapolated, then
|
||||
stale; organisms never) and sub-tick own-marker presentation. Next: 10.7b client wiring,
|
||||
the stale loss view and a two-client trace.
|
||||
stale; organisms never) and sub-tick own-marker presentation. M10.7b wires it into the
|
||||
engineering client. A lost session's view stays frozen and labelled stale until the
|
||||
reconnect's fresh baseline. In two-client traces, remote markers shown as current stay
|
||||
within about 0.1 m of the true path, and outages show stale. M10.7 is complete. Next:
|
||||
M10.8 authority transfer between two regions (needs a ratified handoff ADR).
|
||||
|
||||
## Previous gate - 2026-10-02
|
||||
|
||||
|
||||
Reference in New Issue
Block a user