Implement M5.5 atomic terrain excavation and debris accounting
This commit is contained in:
@@ -132,3 +132,12 @@ fixed-slot, byte-budgeted local store. [The contract](../world/CHUNK_OWNERSHIP.m
|
||||
specifies construction scratch accounting, current-revision read tokens, regeneration
|
||||
and dirty eviction refusal. No database, distributed lease or durable acknowledgement
|
||||
is implied. Cell edits remain M5.5 and persistence M5.6/5.7.
|
||||
|
||||
## Implemented M5.5 edit boundary
|
||||
|
||||
[ADR-0046](../adr/0046-transactional-excavation.md) implements bounded single-store
|
||||
atomic excavation, per-material occupied-volume transfer to debris, current revisions,
|
||||
request digest plus full-payload retry identity, and bounded history with a command
|
||||
high-water mark. [The contract](../world/TERRAIN_EDITS.md) specifies failure semantics.
|
||||
No mass/density model or persistence is implied. Debris/retry state must accompany
|
||||
geometry in M5.6/5.7 recovery, and M6 must reconcile volume with chemical inventories.
|
||||
|
||||
Reference in New Issue
Block a user