Build cellular tests in network check presets
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 1m55s
Foundation / checks (network) (push) Failing after 9m35s
Foundation / checks (client) (push) Successful in 13m5s
Foundation / checks (postgres) (push) Failing after 4m0s
Foundation / checks (checks) (push) Failing after 17m49s
Foundation / postgres-tools (push) Canceled after 0s
Foundation / server-image (push) Canceled after 0s
Foundation / image (push) Canceled after 0s
Foundation / checks (tsan) (push) Canceled after 8m9s

This commit is contained in:
dingo
2026-10-11 04:19:30 -04:00
parent 3316bf9a8e
commit 8d0a6f0fa4
2 changed files with 6 additions and 5 deletions
+3 -2
View File
@@ -6747,8 +6747,9 @@ diagnostic before its tests.
Run 250 built the network source but exposed two test-gate issues: CTest had
registered the cellular protocol and admission suites while the network build
preset omitted their executable targets, and a version-rejection test still
treated protocol 7 as future after protocols 7-9 were added. The preset now
builds both executables and the negative test uses unsupported version 10.
treated protocol 7 as future after protocols 7-9 were added. The network,
QUIC, client-network and client-package build presets now build both
executables, and the negative test uses unsupported version 10.
Run 250's network test job failed on the stale expectation; the two omitted
tests were not run because their executables were absent. Follow-up CI is
required to confirm the corrected gate.