Move cellular playtest feedback earlier
Foundation / checks (checks) (push) Successful in 4s
Foundation / checks (client) (push) Successful in 4s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (network) (push) Successful in 4s
Foundation / checks (postgres) (push) Successful in 4s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / server-image (push) Successful in 5s
Foundation / postgres-tools (push) Successful in 5s
Foundation / image (push) Successful in 5s

This commit is contained in:
dingo
2026-10-10 20:35:14 -04:00
parent 7a6867b363
commit 9e8de204f0
+16
View File
@@ -587,6 +587,22 @@ M6 accounting contracts. Read GENOME_MODEL, ENERGY_MODEL and REPRODUCTION_MODEL.
Synthetic fixtures are test oracles, not accepted gameplay balance. Ratify the Synthetic fixtures are test oracles, not accepted gameplay balance. Ratify the
offline lifecycle before enabling persistent player lives. offline lifecycle before enabling persistent player lives.
### Playtest timing
Do not wait until 11.9 to learn whether the cell is engaging. After 11.3 and
before expanding mutation in 11.4, run an exploratory hands-on check with a
rough development view: can a player understand what the cell perceives, steer
to useful resources, make feeding choices and feel the cost of movement? Record
confusion, agency and reasons to continue. This is a small design probe, not a
balance study or a locked game rule; use the findings to adjust and retest the
interaction while M11 is still in progress.
After 11.6 adds mutation, descendants and terminal death to the first-life loop,
run a second short human check before treating the UI work in 11.8 as finished.
The formal 11.9 repeated-life playtest still evaluates variety and continuation
across multiple lives. Neither engineering completion nor one positive session
is evidence that the cellular product is compelling.
Status: Status:
- 11.1's design decisions are accepted (ADR-0098, 2026-10-09). The time-based rate - 11.1's design decisions are accepted (ADR-0098, 2026-10-09). The time-based rate
migration (ADR-0089) is next. migration (ADR-0089) is next.