Add M10.6a probe-motion experiment core and session protocol v3
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 2m1s
Foundation / checks (network) (push) Successful in 12m13s
Foundation / checks (client) (push) Successful in 14m28s
Foundation / checks (tsan) (push) Successful in 7m56s
Foundation / checks (checks) (push) Successful in 32m49s
Foundation / postgres-tools (push) Canceled after 0s
Foundation / server-image (push) Canceled after 0s
Foundation / image (push) Canceled after 0s
Foundation / checks (postgres) (push) Canceled after 40m58s

EXPERIMENT (ADR-0094), not an organism movement rule: one non-biological
marker per session, moved by admitted intentions with a shared integer rule
(probe-motion-v1, 100 mm per tick, clamped to the area), held in region
memory only.

- ProbeMarkers: spawn, area, bounded per-marker schedule, catch-up bound
- session protocol v3: marker records in snapshot chunks; the own marker is
  always sent with its applied sequence and area; v1 and v2 are refused
- MotionPredictor (bounded replay from the authoritative marker, corrections,
  error samples), CorrectionSmoother and InputLead
- tests: exact prediction with enough lead, refusal and lead adaptation,
  lost inputs, bounds, marker records through the codec

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
dingo
2026-10-06 15:12:13 -04:00
co-authored by Claude Opus 5.5
parent d781492957
commit ab7e26c02e
20 changed files with 1135 additions and 18 deletions
+3
View File
@@ -528,6 +528,9 @@ headless client with process kill tests done. 10.5 split (ADR-0093): 10.5a sessi
protocol v2 and the replication core done; 10.5b wiring (sessions, evo-server, client,
probe) with process evidence done; 10.5c engineering client switched to M10 sessions
(snapshot views, camera interest, grant bundles, msquic.dll in the Windows package) done.
10.6 split (ADR-0094, EXPERIMENT probe marker, not an organism movement rule): 10.6a shared
probe-motion-v1 rule, server markers, session protocol v3 marker records and the client
predictor done; 10.6b wiring and 10.6c impaired traces follow.
10.6-10.9 planned.
**Entry:** M9 client/session evidence and M7/M8 dev/stage durability. Read