Record cellular probe readiness
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (client) (push) Successful in 5s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 5s
Foundation / checks (network) (push) Successful in 4s
Foundation / checks (postgres) (push) Successful in 4s
Foundation / checks (tsan) (push) Successful in 5s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 4s

This commit is contained in:
dingo
2026-10-11 01:23:32 -04:00
parent 108879d2fc
commit b77d98cdcd
3 changed files with 36 additions and 0 deletions
+7
View File
@@ -374,6 +374,13 @@ scoped change before starting the next segment.
startup, controls, scope limits and the human feedback needed to decide
whether the cellular loop merits further investment. It is ready for use
after CI confirms the v8 server/client build.
- Readiness update (2026-10-11): the maintainer reports that the Git checks
passed, `evo-region` is running, and the client connects. This is operator
confirmation of checks and connectivity; it does not establish that the v8
cellular path was selected or that life creation, movement, feeding and the
on-screen perception work in a hands-on session. Those outcomes and the
exploratory notes remain the 11.3e exit evidence. The 11.4 mutation expansion
stays behind that probe so its feedback can affect the next design decisions.
## Exit boundary