Record green M11.3 CI gate
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (client) (push) Successful in 4s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (network) (push) Successful in 5s
Foundation / checks (postgres) (push) Successful in 5s
Foundation / checks (tsan) (push) Successful in 5s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 5s

This commit is contained in:
dingo
2026-10-11 02:32:22 -04:00
parent 537a7e99b4
commit b7f3d73980
2 changed files with 15 additions and 7 deletions
+5
View File
@@ -402,6 +402,11 @@ scoped change before starting the next segment.
maintenance and movement energy costs, movement outcome and feeding outcome. maintenance and movement energy costs, movement outcome and feeding outcome.
Recovery is identified when tick effects are unavailable. The playtest remains Recovery is identified when tick effects are unavailable. The playtest remains
exploratory; the probe checklist needs a human run before 11.3 closes. exploratory; the probe checklist needs a human run before 11.3 closes.
- CI readiness update (2026-10-11): Gitea run 238 reports success on exact head
`537a7e9`, with all 10 status contexts green: checks, client, deploy, ECS,
network, PostgreSQL, TSAN, postgres-tools and both image builds. Automated
evidence is green for the pushed M11.3 implementation. Only the live human
probe remains before 11.3 closes and 11.4 can begin.
## Exit boundary ## Exit boundary
+10 -7
View File
@@ -6630,7 +6630,7 @@ during old server-session setup. The full remote-session test, fresh client
link, and CI run remain pending; no cellular runtime or playtest success is link, and CI run remain pending; no cellular runtime or playtest success is
claimed. claimed.
## 2026-10-11 — M11.3e-6b/c v9 diagnostics delivery (CI pending) ## 2026-10-11 — M11.3e-6b/c v9 diagnostics delivery (CI green)
The committed cellular tick now exposes transient per-life feedback, the The committed cellular tick now exposes transient per-life feedback, the
cellular server bridge sends it only to the authenticated life owner over v9, cellular server bridge sends it only to the authenticated life owner over v9,
@@ -6651,12 +6651,15 @@ startup check.
Direct CMake regeneration succeeded. The generated Ninja build still remained Direct CMake regeneration succeeded. The generated Ninja build still remained
at `Re-checking globbed directories...` before invoking target compilation, so at `Re-checking globbed directories...` before invoking target compilation, so
the CMake target/preset build itself has not completed. CI and the live-region the CMake target/preset build itself has not completed. The Gitea public commit
human probe remain pending; these automated checks do not assess playability or status endpoint reports `state=success`, 10/10 contexts for exact head
fun. `537a7e99b40d625a9db859a73c060edd6e397644` (run 238): checks, client, deploy,
ECS, network, PostgreSQL, TSAN, postgres-tools, image and server-image. The run
covers the pushed code; its automated results do not assess playability or fun.
The live-region human probe remains the only open 11.3 gate.
The local environment cannot query the operator's running region: `kubectl` The local environment cannot query the operator's running region: `kubectl`
reports that no current context is set and its default `localhost:8080` API is reports that no current context is set and its default `localhost:8080` API is
refused; no `evo-region` or `evo-server` process is running locally. The current refused; no `evo-region` or `evo-server` process is running locally. The
Gitea remote has no CI status exposed through the connected review provider, so maintainer must run the human probe against the operator's region and provide
the maintainer's CI confirmation remains authoritative. the exploratory feedback before 11.4.