2 Commits
Author SHA1 Message Date
dingoandClaude Opus 5.5 66efe87c90 Fix CI: run M10 process tests with the load governor off
Foundation / checks (deploy) (push) Successful in 3m15s
Foundation / checks (ecs) (push) Successful in 1m57s
Foundation / checks (client) (push) Successful in 12m33s
Foundation / checks (network) (push) Successful in 13m19s
Foundation / checks (tsan) (push) Successful in 8m5s
Foundation / checks (checks) (push) Successful in 32m42s
Foundation / checks (postgres) (push) Successful in 43m45s
Foundation / postgres-tools (push) Successful in 20s
Foundation / server-image (push) Successful in 24s
Foundation / image (push) Successful in 2m31s
checks (postgres) failed on both M10.9 pushes: on the shared CI runner one
session measured 22 ms p95 per tick, so the governor correctly refused
and the test's assumption about host speed failed (server-image was
skipped as a result). evo-server gains --m10-load-governor on|off (dev
only): off keeps measuring and exposing the work but never refuses or
sheds. The M10 session, load-smoke and two-process handoff tests use it;
the governor stays covered by its unit tests. Refreshes the dev session
window.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-07 11:58:37 -04:00
dingoandClaude Opus 5.5 265163a9a6 Add M10.8d two-process handoff fault matrix and recovery fixes
Foundation / checks (deploy) (push) Successful in 3m20s
Foundation / checks (ecs) (push) Successful in 1m57s
Foundation / checks (client) (push) Failing after 10m4s
Foundation / checks (network) (push) Successful in 13m3s
Foundation / checks (tsan) (push) Successful in 7m53s
Foundation / checks (checks) (push) Successful in 32m18s
Foundation / checks (postgres) (push) Successful in 43m26s
Foundation / postgres-tools (push) Skipped
Foundation / server-image (push) Skipped
Foundation / image (push) Skipped
ADR-0096. Two real evo-server processes on PostgreSQL (regions 7/161 and
7/162, adjacent areas) run crossings and crossings back, SIGKILL of the
source after prepare and of the destination after stage and after commit,
duplicate and stale ticket retries, a client that never arrives and a
destination that is down. After every scenario SQL checks one owner per
probe, the conserved inventory and frozen-iff-open-transfer.

The matrix found two recovery gaps, now fixed:
- a source restarted after a prepare left the probe frozen for good (its
  abort deadline was in memory): schema v14 overdue_probe_transfers and a
  session-layer sweep abort open outgoing transfers past the ticket
  lifetime plus 10 s by the database clock;
- a ticket replayed at a restarted destination after the probe moved on
  took control back: admission of a committed transfer now requires the
  record as that commit left it.

M10.8 is complete. Refreshes the dev session window.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-06 23:17:49 -04:00