Commit Graph
2 Commits
Author SHA1 Message Date
dingoandClaude Opus 5.5 d98d71e7c0 Show what a bud costs (ADR-0129 amendment)
Foundation / checks (ecs) (push) Successful in 2m20s
Foundation / checks (deploy) (push) Successful in 4m4s
Foundation / checks (tsan) (push) Successful in 9m59s
Foundation / checks (client) (push) Successful in 19m19s
Foundation / checks (network) (push) Successful in 19m24s
Foundation / postgres-tools (push) Canceled after 0s
Foundation / server-image (push) Canceled after 0s
Foundation / image (push) Canceled after 0s
Foundation / checks (postgres) (push) Canceled after 32m13s
Foundation / checks (checks) (push) Canceled after 32m19s
The v10 cellular perception carries the bud cost after the diagnostics block: the
energy (construction plus the bud's provision) and matter per channel one bud takes
from a fully grown cell's reserve. biology::bud_cost reads it from fund_bud itself,
so the shown cost is exactly the charge; the server caches it per genome. The
client shows it and names the channels the reserve is short on. v10 clients must
be rebuilt.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-15 19:11:28 -04:00
dingoandClaude Opus 5.5 972c19843e Propose a funded bud from a grown parent's reserve
ADR-0125 and the M11.5 plan define budding and wildlife descendants. The first
piece is biology only: fund_bud pays the ADR-0032 investment and a 30 s
provision from the parent's reserve, builds the bud at the largest growth the
investment matter allows, and sends construction energy to heat, refusing with
nothing spent when any channel is short.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-13 23:12:50 -04:00