Commit Graph
6 Commits
Author SHA1 Message Date
dingoandClaude Opus 5.5 6262c778c7 Add M9.8e reproducible Windows client package
Static-runtime client-package preset with /Brepro and a build identity printed by
evo-client --version (ADR-0086). tools/client packages an explicit allowlist with
licence texts from the verified sources, BUILD-INFO and SHA256SUMS into a
deterministic ZIP, refusing credentials, profile paths and non-system imports;
verification runs the extracted client without Visual Studio, and a self-test
proves each guard. Publication via Gitea Actions waits for a Windows runner.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 16:48:12 -04:00
dingoandClaude Opus 5.5 5cf8709912 Add M9.8d rebindable engineering controls
SDL-free action/HID-key bindings with conflict validation, a staging editor and
a versioned all-or-nothing controls file (ADR-0085). The adapter maps keys
through the bindings, releases and drains on rebinding, and captures the chosen
key ahead of the toolkit and world. The client adds a Controls panel, key hints,
startup loading with a bounded rejection notice, and --controls/--show-controls.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 11:30:17 -04:00
dingoandClaude Opus 5.5 897055883a Add M9.8c launcher, legend, labelled inspector and click selection
Toolkit-independent launcher, selection, label and outcome-log models with
bounded inputs and fixed error text; Dear ImGui overlay in the native adapter
with toolkit-first event routing and capture; engineering panels for fixture vs
dev region, legend, inspector, session outcomes, notices and dialog. Additive
SessionClient::unreachable_attempts() bounds unreachable connects. Docs, CI
targets and validation evidence updated.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-02 10:09:11 -04:00
dingo a6e8094f57 Bound engineering UI state and session events for M9.8b 2026-10-02 08:22:25 -04:00
dingo 22c7c341ce Qualify pinned Dear ImGui toolkit for M9.8a 2026-10-02 07:53:17 -04:00
dingo 4d6a2b6d83 Record M9.8 decisions and scoped client delivery plan 2026-10-02 07:37:13 -04:00