Commit Graph
9 Commits
Author SHA1 Message Date
dingoandClaude Opus 5.5 69b13d7325 M11-PT-001: wildlife steering stays within the intent length limit
Foundation / checks (checks) (push) Successful in 45m24s
Foundation / checks (deploy) (push) Successful in 4m8s
Foundation / checks (ecs) (push) Successful in 2m18s
Foundation / checks (network) (push) Successful in 19m39s
Foundation / checks (postgres) (push) Successful in 44m48s
Foundation / checks (tsan) (push) Successful in 11m26s
Foundation / checks (client) (push) Successful in 17m4s
Foundation / postgres-tools (push) Successful in 21s
Foundation / server-image (push) Successful in 3m10s
Foundation / image (push) Successful in 3m18s
DEV region 6 stopped at tick 7144 (stall log: append error=13 lives=10, region_step).
The wildlife controller steered toward food by scaling the larger component to 1000, so
a diagonal heading such as {1000, 800} was longer than a cellular intent may be; the
owner refused it, failing the tick, and the deterministic controller asked again every
tick. Earlier tests only had buds already touching food, so none moved.

wildlife_toward scales each component by the exact length, truncates toward zero and
pulls in any rounding excess. A regression test reproduces the refusal and accepts the
steered intent; another checks length, direction and speed over a grid of offsets.
No history changes: the refused ticks were never committed.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 15:05:28 -04:00
dingoandClaude Opus 5.5 a820ff0984 M11-PT-001: read v10 perceptions from servers built before the bud cost
Foundation / checks (ecs) (push) Successful in 2m16s
Foundation / checks (deploy) (push) Successful in 4m4s
Foundation / checks (tsan) (push) Successful in 11m42s
Foundation / checks (network) (push) Successful in 19m59s
Foundation / checks (client) (push) Successful in 21m12s
Foundation / checks (checks) (push) Successful in 46m11s
Foundation / checks (postgres) (push) Successful in 46m18s
Foundation / postgres-tools (push) Successful in 28s
Foundation / server-image (push) Successful in 3m12s
Foundation / image (push) Successful in 3m28s
The bud cost (d98d71e) grew the v10 cellular perception prefix from 82 to 122 bytes
without a version bump. A rebuilt client connected to the live DEV region (server
3e5b8cef, older) refused every perception as wrong_length, closed the session as a
protocol error and reconnected; each reconnect's birth request answered existing_life
and no view ever arrived ("Existing cell is already bound to this account").

The decoder now also accepts the earlier v10 layout, with no bud cost. The two lengths
never coincide (40 bytes is not a whole 48-byte patch). The client already hides a zero
bud cost.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-16 09:11:41 -04:00
dingo 87c1edcd2c M11.9: record solo feedback and living-cell reconnect blocker
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (client) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (postgres) (push) Successful in 4s
Foundation / checks (network) (push) Successful in 4s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 5s
2026-10-16 07:27:48 -04:00
dingo 68958a9e54 Upgrade cellular client to v10 with readable play and assisted steering 2026-10-14 19:53:28 -04:00
dingoandClaude Opus 5.5 d298d31115 Predeclare the M11.9 playtests and add account-free play telemetry
M11.9a (ADR-0130): the repeated-life playtest plan fixes its questions, sample
and recording before any session. summarize_cellular_play derives aggregates
(population, death causes, lifespans, buds, mutations, variety) from a committed
cellular state, and evo-world-clone summary prints them for a region head,
read-only and without account data. The roadmap records M11 status.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-14 08:09:42 -04:00
dingoandClaude Opus 5.5 4751b23857 Record the first M11.3 cellular probe run
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (client) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (network) (push) Successful in 4s
Foundation / checks (postgres) (push) Successful in 5s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / checks (deploy) (push) Successful in 3m44s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 5s
The 2026-10-13 probe in DEV region 100/3 showed steering and feeding
working end to end after the session fixes, and not yet enough game to
judge fun. Record its findings and inputs for 11.4-11.8, and mark the
remaining 11.3 work (engulfment and corpse absorption) in the roadmap.
Also refresh the dev session window (3 h).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-13 18:40:28 -04:00
dingo ab9fbdec8f Deliver cellular tick diagnostics to owners
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (checks) (push) Failing after 39s
Foundation / checks (ecs) (push) Successful in 1m55s
Foundation / checks (postgres) (push) Failing after 52s
Foundation / checks (tsan) (push) Failing after 33s
Foundation / checks (network) (push) Failing after 3m1s
Foundation / checks (client) (push) Failing after 4m30s
Foundation / postgres-tools (push) Skipped
Foundation / server-image (push) Skipped
Foundation / image (push) Skipped
2026-10-11 02:04:55 -04:00
dingo e558ac00c6 Update cellular playtest readiness gates
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (client) (push) Successful in 4s
Foundation / checks (deploy) (push) Successful in 6s
Foundation / checks (ecs) (push) Successful in 5s
Foundation / checks (network) (push) Successful in 5s
Foundation / checks (postgres) (push) Successful in 5s
Foundation / checks (tsan) (push) Successful in 5s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 5s
2026-10-11 01:37:06 -04:00
dingo 108879d2fc Document the first cellular playtest
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (client) (push) Successful in 5s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 5s
Foundation / checks (network) (push) Successful in 5s
Foundation / checks (postgres) (push) Successful in 4s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 4s
2026-10-11 01:15:27 -04:00