4.3 KiB
M12 integration and evidence still required
This is the current completion audit following the maintainer's request to try all of M12. M11.9 remains closed for now. M12.2 decisions are delegated and recorded in ADR-0139; no additional product approval is inferred as a coding prerequisite. Completed scoped commits do not mean their entire roadmap gates have passed.
Persistence boundary resolved by 12.3b
ADR-0142 adds dedicated profile 5, population trace 1 and schema 44; raw profile 4 retains its meaning. Explicit no-tick migrations preserve the complete biology. The publisher, replay verifier, immutable SQL evidence, recovery and owning host now support exact population membership with entry disabled by default. Private PostgreSQL tests cover ambiguity, fencing, profile races and publisher process kills. Scope and limits distinguish those tests from executable/network fault drills and deployment-host qualification still required. This resolves the architectural profile conflict and permits the next durable interval work. It does not close all of M12.3 or authorize production enablement.
Dependent ecological integration
| Gate | Existing useful basis | Work/evidence still required |
|---|---|---|
| 12.2 | Exact cellular model and paired matrix; local samples through 256 lives | Deployment-host tail costs including publication; larger wildlife cohorts, predation/twins and contention coverage; useful compression remains unimplemented. |
| 12.3 | Dedicated population profile/trace/store/owning host; exact recovery and private PostgreSQL fault tests | Population-specific executable/network fault drills and target-host publication/capacity qualification. |
| 12.4 | Current worker advances unattended wildlife and preserves running scheduling debt | Durable ecological interval admission/backlog recovery; exact biological source/destination escrow, partition/duplicate settlement and stock-in-transit audits. |
| 12.5 | Finite cellular contact feeding/decay and separate M6 producer/consumer resource owner | One jointly owned cellular/environment budget, explicit effective depth and source entitlements, versioned water/atmosphere species mapping and producer coefficients, plus closed/open and nutrient-exhaustion comparisons. |
| 12.6 | Retained genome/organism archive with ancestry and common-ancestor queries | Append-only population census/history events in the same durable commit, bounded world history queries/indexing and client presentation; no account power or invented precise statistical ancestry. |
| 12.7 | ADR-0133's viability/unknown semantics | Durable region-set/watermark reconciliation covering every owned representation, suspended/viable stock and migration escrow. Missing/stale regions must prevent terminal extinction. |
| 12.8 | Deterministic seed/regime drivers and separate-process exact continuation | Reproducible integrated worlds running for actual days, real restarts/clone comparisons and retained accounting/diversity/cost audits. Accelerated tests cannot supply elapsed days. |
| 12.9 | M11 feedback and current UI review retained | Returning-player samples on the integrated ecology and explicit product/3D readiness decision after soak evidence. No M12 product acceptance or World0 promotion is inferred. |
Do not couple the current cellular habitat to a copied M6 stock view: two owners would then spend the same resources. M6 currently owns ten finite field channels and exactly two configured actors; cellular lives own energy and C/N/P/other plus finite deposits. Their geometry, ownership and chemical units need a versioned mapping, not a renamed fixture. ADR-0136 step A is implemented; proposed infall and photosynthesis steps B/C do not silently become accepted M12 mechanics.
The engineering constitution requires stopping expansion at this architectural boundary and documenting the resolution. That does not prevent the independent worker scheduling correction or the dedicated exact population adapter above. Durable ecological intervals are the next substantive coding segment; none of the rows above is closed by adding a placeholder service.
Current expansion readiness: no-go for M13 integration or World0 promotion while these M12 integration/evidence gates remain open. This records the present engineering evidence, not a substitute for the later maintainer product review.