Files
aevolution/docs/engineering
dingoandClaude Opus 5.5 6e2b3f858c
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (network) (push) Successful in 5s
Foundation / checks (client) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 5s
Foundation / checks (postgres) (push) Successful in 4s
Foundation / checks (tsan) (push) Successful in 5s
Foundation / checks (deploy) (push) Successful in 4m29s
Foundation / postgres-tools (push) Successful in 6s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 5s
fix(deploy): keep DEV on region 8 until its image is promoted
The region 9 switch pointed the DEV provision hook at the cellular-v8
opening while the overlay still pinned a server image built before that
opening, so the old tool refused its arguments and the Argo sync failed at
region-provision. Restore region 8 / cellular-v7; the region 9 switch will
land together with the promotion of an image that contains schema 57,
cellular-v8 and session v12.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-20 06:06:38 -04:00
..
2026-10-15 09:32:51 -04:00