Revise milestones and defer Playwright to manual test handoffs
This commit is contained in:
@@ -166,6 +166,11 @@ Tracked across:
|
||||
- Networking: is node size (128x128x128) fixed/final, or a placeholder for tuning?
|
||||
|
||||
## Backlog
|
||||
- Follow the agreed milestone order and handoff in the systems roadmap. Model rigs,
|
||||
equipment attachments, animations, and sound hooks are milestone 4.5. Commit and
|
||||
push after each milestone, then hand off for the user's manual playtest before
|
||||
continuing. Playwright automation is deferred in [PLAYWRIGHT-TODO.md](PLAYWRIGHT-TODO.md);
|
||||
required type/build checks and Go lifecycle tests remain in place.
|
||||
- See [Systems roadmap](SYSTEMS-ROADMAP.md) for the September 8 draft covering
|
||||
gathering professions, biomes, mobs, crafting, terrain, combat, spells, abilities,
|
||||
structures, survivor hubs, presentation, social systems, and live administration.
|
||||
|
||||
Reference in New Issue
Block a user