Commit Graph
5 Commits
Author SHA1 Message Date
dingoandClaude Sonnet 5 f4068946ed Revert the six post-merge patch commits; back to the portal-merge state
Reverts the working tree for these six files to their state at 7c5cb78
(the control-portal merge, reconciled with the auto-deploy digest bump)
-- undoing c5b8361, 74ff146, b1a07b7, db3e5a8, 0bb3e4b, and 9b226f7.

Those six commits were reactive fixes chasing CI failures one at a
time; each one changed the failure mode without ever reaching a fully
green run, and the last one coincided with the browser session itself
crashing mid-test rather than a logic assertion failing. Reverting to
a clean, known point (right after the merge, before any of that
patching) rather than continuing to layer fixes on an unverified base.

Note: this reintroduces a real, independently-confirmed bug fixed by
db3e5a8 -- deploy/chart/templates/worlds.yaml's per-world loop is
missing a newline between iterations (a leading whitespace-trim on the
$host template variable eats it), which breaks `helm lint` /
`helm template` for any values file with more than one world. That
will fail again on the next push if it isn't re-applied.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-06 13:15:04 -04:00
dingoandClaude Sonnet 5 74ff146717 diag: log rejected intents server-side; preserve e2e artifacts on CI failure
The boss-attack e2e test keeps reporting bossHp completely unchanged
(1200, not just short of the timeout) on the CI runner, across two
separate runs, while it passes reliably in ~11s locally. Couldn't get
more signal from the runner itself: test-results/ (screenshots,
trace.zip, error-context.md) was never uploaded anywhere by the
workflow, so it's gone the moment the ephemeral job container is torn
down -- there was nothing left to retrieve.

Two changes to actually get signal on the next failure instead of
guessing blind:

- internal/transport/http.go: a rejected intent (e.g. "boss out of
  reach", "attack cooldown") already gets stored on c.Message for the
  client to show as a notice, but was never logged server-side. Now it
  is, via slog.Warn, so it shows up directly in the [WebServer] console
  output already captured in the job log -- no artifact retrieval
  needed.
- .gitea/workflows/build.yaml: upload test-results/ as a build artifact
  when the verify job fails, so trace.zip etc. survive past the job
  container for cases where the console log alone isn't enough.

Verified server still builds/vets clean and the full local e2e suite
(all 7 tests across game.spec.ts + portal.spec.ts, matching CI's count)
still passes.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-06 11:57:36 -04:00
dingoandClaude Sonnet 5 5df2f1b681 Merge control portal work from RPGTheory/aeternalis-portal
RPGTheory/aeternalis-portal had diverged from this repo (the git/CI/CD
copy) with an in-progress control portal feature that was never synced
back here, so none of it had gone through CI or been deployed:

- New site/game/control routing split: index.html becomes a world
  directory landing page (site.ts), game.html is the renamed former
  index.html (main.ts), control.html is a new admin panel
  (control.ts, portal-shared.ts, portal.css).
- Server: new internal/store/portal.go (character/world registry,
  command queue, admin grants) and internal/transport/control.go
  (portal API routes), plus a new internal/gitops package that lets
  the portal provision new worlds via a GitOps repo commit.
- game.World gains BornAt/DiedAt/DeathReason and an operator Control()
  path (close/open admissions, awaken boss, end world, per-character
  rename/heal/unstuck/retire); death no longer reuses the same
  character id on rejoin, matching the "new life" permadeath model in
  Plan.md rather than the old bypass-prevention test's expectations.
- deploy/: new control-egress network policy and portal/control
  values (admin role, GitOps repo/branch/values file/CIDRs).
- New e2e coverage: tests/portal.spec.ts, tools/capture-world.mjs.

Verified this repo's own independent commits (800ms movement-staleness
window, 20s boss-attack poll, SRS/TLS deploy values, ubuntu-22.04
runner pin, DOCKER_HOST fix) were already present in the portal copy
before merging, so nothing here regresses them. `tsc --noEmit`, the
vite client build, and the protocol contract check all pass; no go.mod
changes. Could not run `go build`/`go test` locally (no Go toolchain
on PATH, Docker daemon not running) — every new/changed Go symbol was
manually cross-referenced and resolves, but this should still be built
and tested in CI before merging to master.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-09-06 11:08:44 -04:00
dingo 194bb917b1 world.go:473 — widened the movement-staleness cutoff from 250ms → 800ms. This is just a safety net for a truly dead connection (explicit disconnect/blur/tab-hide handlers already zero movement immediately), so loosening it doesn't weaken anything real — it just tolerates a slow frame instead of stranding a walk-to-target action.
tests/game.spec.ts:85 — bumped the boss-attack poll timeout 15s → 20s as extra headroom on slow CI hardware.
2026-09-06 08:14:09 -04:00
dingo ff87b8a544 Build playable Aeternalis foundation and GitOps deployment pipeline 2026-09-05 12:52:51 -04:00