53 lines
1.6 KiB
Markdown
53 lines
1.6 KiB
Markdown
# Nutrient Timing Clarification
|
||
|
||
The nutrient schedule is based on **elapsed time after pitch**, not calendar date labels.
|
||
|
||
Recorded pitch time:
|
||
|
||
```text
|
||
2026-07-16 22:51 EDT
|
||
```
|
||
|
||
## Actual early nutrient timing
|
||
|
||
| Target | Actual/Planned time | Elapsed from pitch | Status |
|
||
|---|---|---:|---|
|
||
| T+24h nutrient | 2026-07-17 21:40 EDT | 22.8h | Done |
|
||
| T+48h nutrient | 2026-07-18 21:06 EDT | 46.3h | Done |
|
||
| T+72h nutrient | 2026-07-19 21:08 EDT | 70.3h | Done |
|
||
| Rest/watch night | 2026-07-20 evening | ~94h | No Fermaid O by default |
|
||
| Day 5 / 1⁄3 sugar-break check | 2026-07-21 21:00 EDT | ~118h | Upcoming |
|
||
|
||
## Why the file labels are confusing
|
||
|
||
The repo originally used:
|
||
|
||
```text
|
||
day-1-brew-day.md = brew day / pitch
|
||
day-2.md = about T+24h
|
||
day-3.md = about T+48h
|
||
day-4.md = about T+72h
|
||
```
|
||
|
||
But the fermentation log uses Day 0 for pitch, then Day 1, Day 2, Day 3 for elapsed days after pitch. Both conventions are common, but mixing them is confusing.
|
||
|
||
## Correct interpretation
|
||
|
||
- `day-4.md` means the **third nutrient addition at about T+72h**.
|
||
- That was already completed on `2026-07-19 21:08 EDT`, about 70 hours after pitch.
|
||
- `2026-07-20 21:00 EDT` is about 94 hours after pitch, so it is a rest/watch night.
|
||
- The next possible nutrient action is the Day 5 / 1⁄3 sugar-break check around `2026-07-21 21:00 EDT`.
|
||
|
||
## Practical rule
|
||
|
||
For the current batch, trust this sequence:
|
||
|
||
```text
|
||
T+24h: 3 g Fermaid O — done
|
||
T+48h: 3 g Fermaid O — done
|
||
T+72h: 3 g Fermaid O — done
|
||
T+~120h / Day 5: check gravity/activity; maybe final 3 g Fermaid O
|
||
```
|
||
|
||
Do not add Fermaid O on the rest/watch night unless troubleshooting indicates a reason.
|