Update M11 playtest readiness status
Foundation / checks (checks) (push) Successful in 4s
Foundation / checks (client) (push) Successful in 5s
Foundation / checks (deploy) (push) Successful in 6s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (network) (push) Successful in 5s
Foundation / checks (postgres) (push) Successful in 5s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 5s
Foundation / checks (checks) (push) Successful in 4s
Foundation / checks (client) (push) Successful in 5s
Foundation / checks (deploy) (push) Successful in 6s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (network) (push) Successful in 5s
Foundation / checks (postgres) (push) Successful in 5s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 5s
This commit is contained in:
+11
-2
@@ -604,8 +604,17 @@ across multiple lives. Neither engineering completion nor one positive session
|
||||
is evidence that the cellular product is compelling.
|
||||
|
||||
Status:
|
||||
- 11.1's design decisions are accepted (ADR-0098, 2026-10-09). The time-based rate
|
||||
migration (ADR-0089) is next.
|
||||
- 11.1's design decisions and per-second rate migration are complete. The 11.3
|
||||
engineering probe is executable, and the maintainer has confirmed the region
|
||||
server starts and accepts the client. Run the exploratory movement/feeding
|
||||
check now; it tests whether the basic cell interaction is understandable,
|
||||
before mutation choices are expanded.
|
||||
- 11.4a and 11.4b are implemented. The 11.4c reservation gate is green in CI
|
||||
runs 274 and 275, but durable selection publication and restart recovery are
|
||||
still outstanding. The mutation-choice playtest becomes possible in 11.4d,
|
||||
after the client choice/review flow is connected; this remains within M11.
|
||||
- 11.5 through 11.9 remain after 11.4. In particular, repeated-life playtesting
|
||||
in 11.9 assesses descendants, permanent death, and variety across lives.
|
||||
- M10's exit evidence for native-client responsiveness is open (BACKLOG): the
|
||||
maintainer's observation moves to the later 2k drill.
|
||||
|
||||
|
||||
Reference in New Issue
Block a user