Close M11.9 for now and review the overhauled cellular UI
Foundation / checks (client) (push) Successful in 4s
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (network) (push) Successful in 4s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / checks (postgres) (push) Successful in 4s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 4s

This commit is contained in:
dingo
2026-10-17 11:35:56 -04:00
parent fcc6c57320
commit 8b54e7447a
8 changed files with 125 additions and 8 deletions
+9 -8
View File
@@ -4,7 +4,7 @@ Requested scope: ecological identity, population qualification, durable automati
tier transitions, unattended scheduling/migration and environmental coupling.
Commit and push each validated scoped segment separately.
## Gate status (2026-10-16)
## Gate status (2026-10-17)
| Subset | State | Evidence or condition for completion |
|---|---|---|
@@ -14,12 +14,13 @@ Commit and push each validated scoped segment separately.
| 12.4 | Blocked on 12.2-12.3 | Existing cellular worker pauses without sessions/lingering players; bounded unattended recovery and biological migration escrow remain unimplemented. |
| 12.5 | Blocked on 12.2-12.4 | Finite M6 process fixtures do not qualify coupled persistent cellular/cohort atmosphere/water budgets. |
M12's roadmap entry also requires the M11 playable-loop product review. The
[M11.9 plan](M11_9_DELIVERY_PLAN.md) now links the maintainer's
[solo feedback](../playtests/2026-10-16_M11_9_SOLO_FEEDBACK.md), including the
living-cell reconnect blocker and repetitive-loop concerns. Full sample/retests
and product acceptance remain incomplete. Beginning policy work or synthetic
population experiments does not fabricate that acceptance.
The maintainer explicitly closes M11.9 for now on 2026-10-17 and authorizes M12
continuation; see the [closure decision](M11_9_DELIVERY_PLAN.md). The recorded
solo sample and fun/variety questions remain incomplete empirical evidence and a
follow-up backlog. They no longer block M12 engineering under that decision.
Current work must use the overhauled microscope UI and implemented rules 8
(ADR-0136 step A, ADR-0137), not the older square-patch/rules-6 baseline. Proposed
colony, infall and photosynthesis mechanics remain outside this implementation.
Executed 12.2a results and remaining limits:
[M12_POPULATION_QUALIFICATION](M12_POPULATION_QUALIFICATION.md). Release CTest
@@ -50,7 +51,7 @@ cannot by itself establish useful aggregation or acceptable target-host cost.
Measure bin/interval sensitivity, conversion and full-region costs on the Linux
target host, including active fallback capacity and backpressure. Passing the M4
synthetic envelope alone is insufficient. Record M11's product review separately.
synthetic envelope alone is insufficient. Preserve the scoped M11 closure above.
Only then accept the model/tier ADR and proceed to 12.3, followed by owned durable
intervals/escrow in 12.4 and versioned finite resource coupling in 12.5. No World0
deployment or promotion follows from these gates.