Close M11.9 for now and review the overhauled cellular UI
Foundation / checks (client) (push) Successful in 4s
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (network) (push) Successful in 4s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / checks (postgres) (push) Successful in 4s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 4s
Foundation / checks (client) (push) Successful in 4s
Foundation / checks (checks) (push) Successful in 5s
Foundation / checks (ecs) (push) Successful in 4s
Foundation / checks (deploy) (push) Successful in 5s
Foundation / checks (network) (push) Successful in 4s
Foundation / checks (tsan) (push) Successful in 4s
Foundation / checks (postgres) (push) Successful in 4s
Foundation / postgres-tools (push) Successful in 5s
Foundation / server-image (push) Successful in 5s
Foundation / image (push) Successful in 4s
This commit is contained in:
@@ -1,5 +1,10 @@
|
||||
# M11.9 solo feedback recorded 2026-10-16
|
||||
|
||||
Later decision (2026-10-17): the maintainer closes M11.9 for now and authorizes
|
||||
M12 continuation. This report preserves what was observed at the time; its open
|
||||
questions are follow-ups rather than a continuing M11.9 prerequisite block.
|
||||
Later commits also replace the older UI and food rules described by this report.
|
||||
|
||||
Source: the maintainer's answers to the eight questions in
|
||||
[the predeclared playtest plan](M11_9_REPEATED_LIFE_PLAYTEST.md), supplied in chat.
|
||||
This is a report date, not a verified session date. One solo participant is
|
||||
|
||||
@@ -1,5 +1,10 @@
|
||||
# M11.9 repeated-life playtest plan
|
||||
|
||||
2026-10-17: the maintainer closes this gate for now and authorizes proceeding to
|
||||
M12. The original sample plan and observations remain historical evidence;
|
||||
uncompleted tests and reported issues stay on the follow-up backlog. See the
|
||||
[closure decision](../engineering/M11_9_DELIVERY_PLAN.md).
|
||||
|
||||
Recorded feedback: [2026-10-16 solo report](2026-10-16_M11_9_SOLO_FEEDBACK.md).
|
||||
It preserves the original questions below, records a living-cell reconnect blocker
|
||||
and six local retest issues, and does not grant product acceptance.
|
||||
|
||||
Reference in New Issue
Block a user