Foundation / checks (tsan) (push) Canceled after 0s
Foundation / postgres-tools (push) Canceled after 0s
Foundation / server-image (push) Canceled after 0s
Foundation / image (push) Canceled after 0s
Foundation / checks (client) (push) Canceled after 1m11s
Foundation / checks (checks) (push) Canceled after 1m13s
Foundation / checks (postgres) (push) Canceled after 1m8s
Foundation / checks (ecs) (push) Canceled after 1m13s
Foundation / checks (network) (push) Canceled after 1m14s
Foundation / checks (deploy) (push) Canceled after 1m18s
58 lines
3.3 KiB
Markdown
58 lines
3.3 KiB
Markdown
# ADR-0168: Durable raw retained-plan admission
|
|
|
|
## Status and scope
|
|
|
|
Accepted scoped persistence segment of ADR-0163/0165-0167, 2026-10-19. Raw
|
|
profile 4 only. No automatic upgrade, default/DEV change, population conversion,
|
|
migration/census qualification, control succession or client-choice UI.
|
|
|
|
## Decision
|
|
|
|
Schema 55 admits exactly raw bundle 12 with trace 4 through the existing fenced
|
|
cellular publisher. Only explicit raw bundle 11 -> 12 no-tick upgrades use the
|
|
immutable cellular profile/version journal. Verify both source bindings, derive
|
|
the complete owner upgrade and read back the target object before publishing.
|
|
Journal evidence, result commit and head move remain one transaction under the
|
|
current lease/exact head. Pending intervals/handoffs prevent new upgrades.
|
|
|
|
Retain original manifests, traces, input blocks and digests. SQL may normalize
|
|
parser-local copies of the tuple/trace layout only after verifying the actual
|
|
trace length/SHA-256 and exact owner/trace version pairing. Stored bytes, retry
|
|
identity and authority checks always use the actual bundle-12/trace-4 evidence.
|
|
Legacy helpers remain private. No new runtime privilege or provisioning path.
|
|
|
|
Mutation outcomes are derived by complete C++ replay and bound atomically to the
|
|
existing allocator reservation and action block. For this editing mode only,
|
|
admit result 4 (offspring plan applied), 3 (declined) or 1 (life died); reject
|
|
in-life applied/funding result meanings. A decline must match operator zero;
|
|
successful plan selection must match a nonzero operator. Old result domains and
|
|
old trace/tuple meanings remain unchanged. Recovery loads the exact actions,
|
|
replays the complete checkpoint, and compares every result and all target bytes.
|
|
|
|
Upgrade recovery verifies the immutable source/target manifests and objects,
|
|
journal versions/digests and exact retained transformation using the original
|
|
writer fields under current recovery authority. Missing, corrupt or biologically
|
|
false evidence fails closed without an older-head fallback. Exact retries retain
|
|
original bytes/receipt; changed retries conflict and stale writers remain fenced.
|
|
|
|
Bundle 12 remains raw-only. Population/census/migration adapters must refuse it,
|
|
and unsupported evidence cannot become zero life or terminal extinction. A
|
|
recovered raw owner may continue authoritative biology; no worker opts into the
|
|
upgrade automatically. NPC behavior retention, birth-time one-way control and
|
|
their presentation remain separate contracts.
|
|
|
|
## Alternatives, consequences and qualification
|
|
|
|
New genesis would discard ancestry/stock history; a second upgrade journal would
|
|
duplicate authority. Broadly admitting every revision bundle would mix two
|
|
mutation meanings. Use the existing journal and an exact tuple/trace/result set.
|
|
|
|
Risks include parser normalization bypassing strong bindings, wrong result
|
|
meanings and partial history after ambiguous publication. Require private SQL
|
|
tests for the upgrade, exact recovery/continuation, earned plan selections and
|
|
repeated funded births, stale/current leases, exact/conflicting retries, rollback,
|
|
pending work, missing/corrupt/false objects and replacement recovery. Run the full
|
|
persistence/backup/DR/upgrade and privilege/checksum matrix plus appropriate
|
|
portable, analysis and sanitizer checks. This is not M12 completion or a product
|
|
acceptance decision.
|