The maintainer applied the platform layer, World0 admission policy and projects; verify-isolation.sh passed every guardrail, RBAC-negative, admission dry-run and cleanup check. Its three project failures were a script defect (destinations and the empty cluster whitelist were printed together as "[]"); check them separately. Ignore local result files, add docs/BACKLOG.md with break-glass membership and the storage re-probe, and record leaving Argo's default project unrestricted as an accepted risk. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
17 lines
1.5 KiB
Markdown
17 lines
1.5 KiB
Markdown
# Backlog
|
|
|
|
These items are deferred on purpose, or they await a maintainer decision. They are
|
|
not scheduled roadmap gates. When a roadmap gate depends on an item, the gate
|
|
names it. Remove an item only when it is done, and record where it was done.
|
|
|
|
| Item | Raised | Why deferred | Needed before |
|
|
|---|---|---|---|
|
|
| **World0 break-glass membership.** Decide who may act as `aevolution:world0-break-glass`, and how that group is granted: for example a short-lived client certificate with that organization, or an OIDC group. Decide also how its use is approved and recorded. The admission policy already enforces the group (ADR-0069). | M8.2, 2026-09-29 | Maintainer: figure out later | Any intentional deletion of World0 data or identity; M8.8 World0 launch |
|
|
| **Storage after the RAID/disk rework.** Re-run `deploy/kubernetes/inventory/disk-probe-local-path.yaml` (or a new class), and update INVENTORY.md. | M8.1, 2026-09-29 | Maintainer is reorganizing disks | M8.3's final storage decision |
|
|
|
|
## Accepted risks (maintainer decisions)
|
|
|
|
| Decision | Date | Consequence | Mitigation in place |
|
|
|---|---|---|---|
|
|
| Argo CD's `default` AppProject stays unrestricted | 2026-09-29 | Applications in `default` (other projects, two with automated prune) can create objects in any namespace, including AEvolution's. | The World0 admission policy denies every deletion of World0 data, identity and delivery objects, whatever the project (ADR-0069). The AEvolution projects themselves are scoped. |
|